SSE Long Term Liability Study

SSE Generation required a high level but robust assessment of its liabilities to assist in the
determination of adequate provision for business and reporting purposes.

RVA were able to demonstrate both the experience and industry data to make such an assessment at an appropriate level of detail and respond in a relatively short time from instruction to proceed.

The methodology employed has been both rigorous and transparent, involving site visits and desk top analysis to provide a model based on required resources, scrap and waste with the underlying assumptions captured in both the model and accompanying report,  thereby providing a high degree of confidence in the estimated costs at both individual site and business unit level.

The outcome was delivered on schedule with adequate opportunity for review and adjustment so thatteams were involved in developing the approach and the results.

Finally, the RVA team engaged local site management in a highly professional and efficient manner interviewing key site personnel to obtain the essential information but minimizing disruption to operations.

I would have no hesitation in approaching RVA for a similar project in future.

Share